Bart with dust collector

for conveying extracted dust for a distance of up to 30 meters.

Dosa-Flow

Suitable system for the metering of cement and ready-mixed concrete.

Bag splitter with screw conveyor or Bart

for emptying bags and the subsequent conveying of the material.

Big bag unloading station with Bart

for emptying big bags and the subsequent conveying of the material.

TPA with insulated pipes for high temperatures

for conveying fly ash or materials at high temperature.