Through Simem, a company that designs and manufactures systems for the construction industry, we supplied a cement and pozzolan conveying system for the Panama Canal expansion project.
This solution includes two conveying lines. Line 1: distance 60 meters, capacity 40 metric tons/h.
Line 2: distance 80 meters; capacity 60 metric tons/h, full-pipeline continuous system.