Transport of cement and "pozzolana"

Case Study AIR-TEC BLACK

Customer: Canal de Panamà

Material: Cement

Canal de Panamà
Through Simem, a company that designs and manufactures systems for the construction industry, we supplied a cement and pozzolan conveying system for the Panama Canal expansion project.
This solution includes two conveying lines. Line 1: distance 60 meters, capacity 40 metric tons/h.
Line 2: distance 80 meters; capacity 60 metric tons/h, full-pipeline continuous system.
 
Canal de Panamà
Simplicity of planning
Versatility of application
Reduced costs of maintenance
Solutions for the transport in dense phase for the housebuilding